At custody transfer, construction and operations rarely agree on what was actually installed — because both have money riding on the answer. We're the neutral party that documents reality, asset by asset, and hands the same record to both.
This isn't about bad faith. It's structural — the two parties are measured on opposite outcomes, and at handover that tension has to land somewhere.
One walk-down produces all of it simultaneously. We're already in front of the unit with the nameplate in hand — every downstream document flows from that.
Every asset walked, tagged, photographed. Make, model, serial, nameplate ratings, location, upstream feed, criticality. As installed, not as specified.
per assetEvery difference between the drawings and the floor, documented with photographs. Wrong model, moved location, missing tag, altered configuration, absent equipment.
per assetManufacturer O&M, IOM and parts documentation assembled and indexed to the exact model installed — sourced from the manufacturer, at the current revision.
per make / modelRecommended stocking list per model with part numbers, lead times, and which items you cannot afford to be without. Rebuild kit contents where the OEM offers one.
per make / modelWhat your crew needs to service the unit — including the proprietary tool that only that manufacturer makes and that nobody discovers is missing until 2am.
per make / modelPublished service bulletins, field notices, firmware advisories and documented failure modes for the exact model — gathered from manufacturer and public sources.
per make / modelIntervals per OEM specification, not a generic quarterly guess, with warranty-interval flags where a missed PM voids coverage. Loadable into your CMMS.
per make / modelA full procedure set per model — maintenance, operating, emergency and preventive — written to your site's power paths and ready for your qualified person to approve.
per make / modelYour crew trained on the procedures we wrote, at the equipment we documented. Onsite or virtual, with a written competency record per technician.
per classA site with two hundred assets usually has fewer than twenty distinct make and model combinations. You pay to verify each asset once, and to document each model once — not two hundred times.
Illustrative. Homogeneous sites with fewer distinct models cost substantially less — a hall with 400 CRAHs of one model pays for one documentation package, not four hundred. Travel and mobilization quoted separately.
If a budget already exists, skip the proposal theatre. Tell us what's allocated and what you need against it. If it's anywhere near practical we'll say yes and scope to fit. If it isn't, we'll say so plainly and tell you what the number would need to be — no chasing, no revised proposals, no six-week sales cycle.
Rough counts are fine. We'll come back with a fixed-scope proposal against your turnover date.