Site procedure program

Every asset. Every procedure. Written down.

A complete asset registry, a numbered procedure index synced to PM frequency, site-specific procedures built from your own drawings and nameplates, and a formal incident playbook — detailed enough that a tech who isn't your best tech can execute it correctly at 3am.

What you get

Four deliverables. One integrated set.

Most sites have some of this in a shared drive, written by three different people over four years, with no numbering and no link to the CMMS. We build it once, as a system, with an index that tells you what exists and what's missing.

01 — Registry

Asset registry

Every asset captured and tagged: family, make, model, serial, nameplate ratings, location, upstream feed, and the criticality rating that drives its PM frequency.

02 — Index

Procedure index

A numbered master list mapping every asset to the procedures it requires, at what frequency, with revision status. You can see the gaps before an auditor does.

03 — Procedures

Site-specific PMs and MOPs

Written against your drawings, your nameplates, your power paths — not generic. Real tags, real setpoints, hold points where they belong, closeout codes matched to your CMMS.

04 — Playbook

Incident management playbook

EOPs by scenario with severity tiers, escalation chains with named timelines, decision points, and restoration sequences. Printed, bound, and at the desk — not on a server that just lost power.

Scope it yourself

Count your assets. See the number.

Set your counts below for a planning-level estimate. Final scope is fixed in a written proposal after we review your documentation package — this is an anchor, not a quote.

Asset counts by family
Assets in registry0
Procedures generated0
  of which multi-path0
EOP scenarios0
Planning estimate
$0
Annual revision retainer$0

Registry $115/asset · standard procedure $895 · multi-path $1,950 · playbook $16,500 base plus $2,100/scenario · retainer 18% of build, keeps every document current through equipment and standards changes.

Scope is fixed to counts. Pricing is per asset and per procedure, not open-ended. If your asset count changes or documentation arrives incomplete, that's a written change order before any additional work starts — never a surprise on an invoice.
Requirements

What you have to give us.

Site-specific means built from your documentation. We don't invent a torque value, a setpoint, or a breaker position. Any value we can't confirm from a source below gets flagged in the document as unverified and comes back to you for confirmation — it never gets guessed.

OEM manuals

Manufacturer O&M documentation for each asset family. OEM guidance governs wherever anything conflicts.

Nameplate / dataplate

Photos or captured data. Ratings, serial, model, and configuration as installed — not as specified.

One-lines and power path

Required for anything we isolate, transfer, or de-energize. Without it we cannot write an electrical procedure, full stop.

Drawings and submittals

Approved submittals, mechanical and electrical sets, and sequences of operation at the latest issued revision.

CMMS and codes

Your work-order system and closeout code strings, so procedures actually close the work order instead of orphaning it.

Approval authority

Who signs. Your qualified person or engineer of record reviews and approves every document before it's issued for use.

How we handle your documentation. Mutual NDA before anything transmits. Encrypted transfer, access limited to the people on your engagement, and a defined retention period with certified deletion at close. Your drawings, topology, and site data are never reused, referenced, or repurposed on any other client's work. Ever.
Start

Send us your counts and we'll send back a proposal.

Your calculator inputs are attached automatically. We reply within two business days with a fixed-scope proposal or a short list of what's missing.