You know this moment. The build is finishing, the schedule is compressed, and the owner's turnover package needs formal procedures that don't exist yet. The one engineer who actually knows the equipment does his best work with a meter in his hand, not in Excel.
We write them. Correctly, in the right order, in a format your qualified person can review and sign.
Not samples. Not excerpts. Three full documents you can put in front of your qualified person this week.
EOP-EHS-EVAC-001REF-EHS-FIRE-001PM-MECH-CRAH-001Procedures are a contract deliverable that sits with whoever has the least time to write them. On a site moving at HPC speed, that's everyone.
The ideal engagement is one where you hand us complete OEM manuals, approved submittals, one-lines and nameplate data. That happens maybe half the time. On a fast build, submittals are still in review, the as-builts don't match what got installed, and nobody has walked the floor with a camera.
When that's your situation, we mobilize a crew and gather it ourselves — asset walk-down, nameplate and dataplate capture, tag verification, equipment counts reconciled against the drawings, and a documented list of every discrepancy we find between what's on paper and what's installed.
That discrepancy log is often worth more than the procedures. Sites discover equipment configured differently than the submittals show, and they discover it from us rather than during an event.
No obligation attached to the free documents. If they're useful, here's where it goes next.